Bathroom remodel tile job

Bathroom remodel
Bathroom remodel

Like a lot of bathroom remodels, this guest bathroom was a complete tear-out to the studs and build back up from there.  A furnace duct ran along side the tub and that became a nice shelf or place to sit.  The Schluter System was used to form a completely waterproof backing behind the tiles.  A 32×60 Delta 400 deep soak tub from Home Depot was surrounded by 12×12 ceramic tiles.  The customer kept the lavatory base and got a new top and faucet.  Two coats of satin paint finished off this guest bathroom remodel.