Bathroom remodel

This bathroom remodel job was gutted out down to the wall studs. ┬áThe job called for a new tub, wall tiles, light fixtures, shutoff valves, and paint. ┬áThe floor tiles, toilet, faucets, and lavatory were all somewhat new and were re-used. ┬áDuring the gutting stage an unknown difficulty presented itself right away. ┬áThe walls were two layers; 1/4″ painted masonite panels over 1/2″ drywall. ┬áNot a huge problem but did result in some spacing issues with the floor tiles. ┬áThe existing window was 100% plastic and glass and the trim I used was a plastic composite sealed in with 60 year latex caulk. ┬áThe wall tiles are set on Schulter Kerdi, and the tiled up shower nook is on a Nobel base. ┬áWe were able to take out the walls without hurting either the ceiling or the floor tiles and that was a relief. ┬áWrapping it up with a nice paint job including the closet

New bathtub and tiles on this bathroom remodel.
New bathtub and tiles on this bathroom remodel.

this job looked great.  Total cost to the customer less than $4500